"C","Morning Report" "C","Report for 9/5/2008" "C","Report Generated 09/05/2008 13:55:15 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Special Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Friday, Sep 5 2008","09:55:15 EDT" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Thursday, Sep 4 2008 hour ending 17",21730 "G","3. Operable Capacity Analysis" "D","A. Installed Generating Capacity",30864 "D","B.Capacity Additions EcoMax Bid > SCC",395 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",2352 "D","E. Uncommitted Available Generation (non fast start)",4958 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",1185 "D","NYISO Cross Sound Cable",330 "D","NB",-528 "D","TransEnergie",-1617 "D","Net Deliveries",-630 "D","G. Total Available Capacity (A+B+C-D-E-F)",24579 "D","H. Peak Load Forecast For Hour 16",22360 "D","I. Total Operating Reserve Requirement",2090 "D","J. Capacity Required",24450 "D","K. Surplus = (+) Deficiency = (-) (G - J)",129 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",129 "G","4. Largest First Contingency" "D","PHASE II",1400 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",25721 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1400 "D","Ten Minute Reserve Estimate:",1400 "D","Thirty Minute Reserve Requirement:",690 "D","Thirty Minute Reserve Estimate:",819 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT","SCHEDULED CONTRACT" "H","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",1200,684 "D","NYISO Cross Sound Cable",330,330 "D","NB",-700,-628 "D","TransEnergie",-2218,-1617 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","CLEAR","S-13",84 "D","Hartford","MOSTLY CLEAR","S-11",88 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","9 Units",752 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"