Installed Capacity Requirements
2011
Annual report on system-wide generating capacity needed to meet reliability standards set by ISO-NE and the Northeast Power Coordinating Council.

Date Document Title Document Type
May 05, 2011
ISO New England Report on the Installed Capacity Requirement, Local Sourcing Requirements, and Maximum Capacity Limit for the 2014-2015 Capacity Commitment Period
PDF (710k)
  Copyright ©2012 ISO New England Inc.