Power Supply Planning Committee Materials
Jan 26, 2012
Examines issues related to the ability of New England’s generation, transmission and other resources to meet reliability requirements including: NEPOOL Objective Capability, Locational ICAP Requirements, Tie Reliability Benefits, and Power System Reliability Studies.

Date Document Title Document Type  
Jan 25, 2012 DOC (69k)
Jan 20, 2012 DOC (79.5k)
Jan 25, 2012 DOC (67.5k)
Jan 09, 2012 DOC (815k)
Jan 09, 2012 PDF (134k)
Jan 20, 2012 DOC (292k)
Jan 25, 2012 PDF (261k)
Jan 23, 2012 PDF (505k)
Jan 20, 2012 PDF (123k)
Jan 25, 2012 PDF (120k)
Jan 26, 2012 PDF (993k)
  Copyright ©2012 ISO New England Inc.